Which Battery Terminal Comes Off First? A 7-Step Disconnect Checklist for Solar Installers

A field-tested checklist for disconnecting a GoodWe battery system safely — which terminal comes off first, how to verify the pack is actually dead, and the paperwork step most installers skip until a warranty claim comes back to bite them.

The short answer, and who this list is for

Negative first. When you disconnect a battery, the negative (ground/return) terminal comes off before the positive one. When you reconnect, it goes the other way around — positive first, negative last.

That's the 10-second answer. The rest of this page is the checklist I use when we're pulling a GoodWe pack out of a live installation, whether it's a warranty swap, a relocation, or a warehouse crew prepping units for shipment.

Who it's for: installers and service techs working on residential and small commercial systems, distributor warehouse staff who break down pallets, and the QC people at a house solar inverter factory who have to sign off that a returned unit was disconnected properly. If you're a homeowner reading this because you want to swap your own battery — stop here and call your installer. Seriously.

Seven steps. The order matters more than any single step.

Step 1 — Identify the system and write down the voltage

Before you touch a single cable, get the model and the nominal voltage off the nameplate. GoodWe's Lynx line isn't one product — the low-voltage stackable versions and the high-voltage rack versions have different safe-handling rules, different breaker locations, and different torque specs on the terminals.

When I first started doing vendor QC on inverter and battery returns, I assumed a battery disconnect was a battery disconnect. Same procedure across brands, right? That assumption cost us a nearly new terminal harness in 2023, and I'll get to that in a minute.

Write the voltage down. Not mentally. On paper or in your phone. You will want it in Step 4 when you're standing there with a multimeter and trying to remember whether this pack should read 48V or 400V.

Step 2 — Shut the inverter down on both sides

AC first, then DC, unless the manual says otherwise. In the GoodWe documentation I've worked from, the shutdown sequence starts at the AC isolator, moves to the DC switch on the inverter, and only then goes to the battery.

Here's the thing: the battery is not the first thing you turn off. It's the last. If you open the battery breaker while the inverter is still energized, you've just created an unplanned islanding event, and some units will log a fault that you then have to clear before the system will come back up. Guess who gets the support call.

While you're at the inverter, glance at the smart meter. If the site is running a GoodWe GM3000 or a grid-side AMI meter like an OpenWay unit, the export/import reading should stop moving. That's your first confirmation that the system isn't still pushing power somewhere.

Step 3 — Trip the battery breaker and let the BMS go to sleep

Open the battery disconnect. Then wait.

Not 10 seconds. Give it a couple of minutes. The BMS needs to power down, the status LEDs need to go dark, and the monitoring app needs to drop the connection. If the app still shows the pack online, the system is not down, no matter what the breaker looks like.

I don't have hard data on how many installers actually wait here, but anecdotally, from the returns I've inspected, it's a lot fewer than you'd hope. Residual charge in the DC bus capacitors is the reason the next step exists.

Step 4 — Verify dead with a meter, not with a label

Multimeter across the battery terminals. DC volts. You're looking for something close to zero, and you need to understand that "close to zero" on a high-voltage pack can still be lethal if you bridge the wrong two points.

This is the step that turned into a lesson for me. In early 2023 we took back a batch of about 40 packs from a contractor who'd done a fast swap. He'd killed the breaker, seen the LEDs go out, and gone straight for the positive terminal. What he didn't account for was that the inverter's DC bus was still holding charge. The arc when his wrench bridged the terminal to the enclosure was loud enough that his apprentice dropped a torque driver off the ladder. Nobody was hurt. The harness and the terminal block were scrap.

The vendor's response to our incident report was, essentially, "the manual says to verify." And they were right. It did. He hadn't read it. We now make verification a signed-off line item on our own service sheets, and I'd push any distributor reading this to do the same.

Step 5 — Negative terminal off first

Now we're at the actual question.

The negative comes off first. The reason is simple once you picture it: the negative terminal is the return path. As long as it's connected, the whole chassis and every metal surface around the pack is part of a live circuit. The moment you break that return path, a wrench that slips and touches the frame does nothing. If you'd gone positive-first, that same slip is a dead short through your tool.

Practically, that means:

  • Insulated tools. Not "mostly insulated." Fully insulated, rated for the DC voltage you wrote down in Step 1.
  • No rings, no watch, no metal bracelet. I've watched a tech argue with me about this and then take his wedding ring off two minutes later without saying anything. Fine. He took it off.
  • One terminal at a time. Don't loosen both and then pull.
  • Keep the removed cable end away from the pack. It's still connected at the other end to something, and it will find a way to touch metal if you let it.

Loosen, lift, and move the cable clear. Slowly. There's no prize for speed here.

Step 6 — Positive off second, then cap and label it

Same procedure, now on the positive. Once it's off, wrap the lug in insulating tape and mark it. Both cables, both ends, labelled.

This feels like busywork until you're the person who has to reconnect it three weeks later in a different building, and the tape has come off one lug, and nobody remembers which cable went where. Put a piece of tape on the pack too, with the date and your initials.

The surprise for me wasn't the electrical risk in this step. It was how much of our return rate traced back to unlabelled or mislabelled cables after a relocation. We were blaming the product for a documentation failure.

Step 7 — Photograph everything before it leaves the site

This is the step almost everyone skips, and it's the one that saves you money.

Four photos, minimum: the pack label with the serial number, the disconnected terminals with the tape on them, the meter reading showing zero volts, and the surrounding enclosure. Send them to whoever owns the warranty record — the distributor, the installer's office, whoever.

Why? Because when a pack comes back and the vendor says "this was damaged in handling," the only thing that settles the argument is a timestamped photo showing the terminals were clean and capped when it left your hands. I've had two disputes in four years go sideways purely because nobody could prove what the pack looked like at handover. Both were resolved in our favour once the photos surfaced. Both took weeks longer than they should have.

If you're a GoodWe inverter distributor shipping units out, this belongs in your warehouse SOP, not in the field. Disconnecting for storage and transport is a different procedure from disconnecting on a live roof, and mixing them up is how you end up with a pallet of packs nobody wants to sign for.

Reconnecting: run the list backward

Positive first, negative last. Torque to spec — and yes, use the torque wrench, not your forearm. Re-energize in reverse order: battery breaker, then inverter DC, then inverter AC. Watch the app come back up and confirm the smart meter is reading again before you pack up.

Common mistakes that turn into warranty claims

  • Trusting the LEDs. Dark LEDs mean the BMS is asleep, not that the DC bus is discharged.
  • Positive-first disconnects. The single most common cause of tool arcs and terminal damage we see.
  • Skipping the meter check. Two minutes with a multimeter is cheaper than a replacement harness.
  • No labelling. Costs you nothing upfront, costs you a service call later.
  • Disconnecting before the inverter is isolated. Expect fault codes and a support ticket.
  • Throwing old packs in general waste. Lithium packs go to a recycler. And if your marketing claims the battery is "recyclable," be careful — per the FTC Green Guides (ftc.gov), that claim needs substantiation, including that recycling facilities are actually available to a reasonable share of buyers.

One caveat on all of this: I can only speak to the systems I've personally inspected — mostly residential GoodWe setups in the 5–20 kWh range and a handful of small commercial installs. If you're working on a multi-pack commercial rack with parallel strings, the isolation steps multiply and the manufacturer's procedure should override anything on this page. Same if your local code authority has specific requirements; check with them, not with me.

And if you only remember one thing: negative first, meter in hand, photo before it leaves the site. Everything else is detail.